EH&S
Eastern Washington University
Cheney, WA 99004
phone: 509.359.6496
fax: 509.359.4690

Procedures & Guidance Documents

(In Progress)

Procedure Documents

  • Medical Monitoring Program (In Review)
  • Hearing Conservation Program (In Review)
  • Chemical Hazard Communication (In Review)
  • Environmental Programs (In Review)
  • Hazardous Waste (In Review)
  • Biohazard Control (In Progress)
  • Lock Out / Tag Out (In Review)

 

Guidance Documents

Asbestos Management / O&M Program

Renovation and Demolition Work On The EWU Campus- Things to Consider Before Work Begins: Asbestos Containing Materials

Maintenance of Asbestos-Containing Floor Coverings

EH&S RAM Package Processing

RAM Package Opening

Radiation Laboratory Survey Guidelines

Analytical X-Ray

Laser Safety

Respirator Cleaning Instructions

Respirator User Seal Check Instructions

Dust Mask Fitting Instructions

Disposal of Laboratory Glassware

Autoclave Safety

Universal Waste Collection and Disposal Safety

Plumbing Safety Practices

Chlorine Gas for Water Treatment

Sodium Hydroxide for Water Treatment

Using Hydrofluoric Acid Safety

Electrical Safety

High Voltage Electrical Safety Practices

Fuel Station Petroleum Safe Handling and Cleanup Safety

 

 

 

 


© 2013 Eastern Washington University